Go Back   Two Wheel Fix > General > Off Topic

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-23-2009, 12:36 AM   #1
'73 H1 Triple
restorer of the original
 
'73 H1 Triple's Avatar
 
Join Date: Mar 2008
Location: Zionsville,PA
Moto: '93 ZR1100 &'73 Kawasaki H1 500
Posts: 1,331
Default HUGE part I'm working on ( plenty of OT )

I put in 60 hours this week welding on this extremely large stainless steel weldment. Plenty of TIG welding and also some MIG welding too.


This is half of the main body. It's 30' long, about 7' deep and just over 8' high.

Out of focus picture of the inside. The fan is set at 7' tall and that's a 6' step ladder in the back. The two augers pictures later will go in each half of this main body.

The auger body, three augers with the drive system will weigh over 20,000 lbs fully assembled.


This will hold three large augers to remove the processed material from the tank.


Where the product comes out of the auger. It's 25" wide and 100" long.


This will bolt up to one end of the auger and along with a heavy steel motor mount ( made of four I beams with 1/2" plate on the top), hold the three motors with speed reducers that will drive the augers.






Those stainless steel augers are 36' long and weigh over 3500 lbs each.

Jeff
previously a machinist, now a welder again for another month or so
'73 H1 Triple is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:53 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.